Past projects

Click on the link "Go to Google Earth" to see the school locations on Google Earth.

1. Project: Primary School Makoko Water Side, Yaba, Lagos, Nigeria

Two-storey lake dwelling built from ironwood, facing the laguna of Lagos. The school includes 8 classrooms;

completed and opened in 1994.
 

01 Grundschule Makoko Water Side

 

2. Project: Primary School Drabo, Republic of Benin

Restoration of a 3-classroom building with office that was already partially completed by the village community; construction of an additional building with 3 classrooms;

completed and opened in 1998.
 

02 Grundschule Drabo

 

3. Project: Primary School Ouega, Republic of Benin

Restoration and completion of a 3-classroom building with office that was already partially completed by the village community. The government constructed an additional building including 3 classrooms;

completed and opened in 1999.
 

03 Grundschule Ouega

 

4. Project: Primary School Idi-Ogou, Pira, Republic of Benin

Construction of 2 buildings with 3 classrooms each as well as office, library and toilets; completed and opened November 4th 2001.
 

04 Grundschule Idi-Ogou

 

5. Project: Primary School Gbedaconou, Republic of Benin

Construction of 2 school buildings with 3 classrooms each as well as office, storage room/library, toilets and a small sanitary ward.

Completed and opened December 13th 2002.
 

05-Gbedaconou

 

This school was regarded as especially eligible by the American Organisation IFESH (International Foundation for Education & Self- Help) in the school year of 2003/2004. The school received an ample donation of school materials from IFESH.

 

05a Krankenstation von Gbedaconou
sanitary ward

Originalgröße
 

05b Die Betreuerinnen der Station

Originalgröße
 
To evacuate difficult cases the Rotary Club of Rosenheim offered an ambulance to the health center.
 

Der Krankenwagen kommt an der Krankenstation von Gbedaconou an
the new ambulance arrives at Gbedaconou

Originalgröße
 

Der Krankenwagen bezieht seine neue Gerage
ambulance and its garage

Originalgröße
 
 

Schlüsselübergabe
hand-over of keys

Originalgröße
 

6. Project: Primary School Aidohoue Finagnon, Republic of Benin

Construction of a 3-classroom building with toilets.

Completion: March 2004
 

06-Aidohoue-fertig

 

7. Project: Public Primary School Kpoto-Agongo, Republic of Benin

Construction of 2 buildings with 3 classrooms each, office- and library building and toilets.

Completion: October 2005
Opening ceremony: October 22nd 2005
 

07 Grundschule Kpoto-Agongo

Originalgröße
 
Both buildings

8. Project: Union Secondary School of Asohouè Cada, community of Tori-Bossito

Construction of
2 buildings holding 3 classrooms each, 1 building holding 4 classrooms, 1 toilet block with 10 cells for girls, 1 toilet block with 10 cells for boys, 2 open halls covered with roofs for breaks and recreation

works closed February 2010
 

08-1 Gymnasium Union Asohouè Cada

Originalgröße
 

08-2 Gymnasium Union Asohouè Cada

Originalgröße
 
 

08-3 Gymnasium Union Asohouè Cada

Originalgröße
 

9. Project: study hall of Ahouandédji, community of tori-Bossito

Construction of
1 hall equipped with furniture and books
1 guest house with toilets
1 public toilet block with 8 cells
1 small elderly people's home
1 pavilion

opened : April 30, 2010
 

09-1 Lernzentrum von Ahouandédji

Originalgröße
 

09-2 Lernzentrum von Ahouandédji

Originalgröße
 
 

09-3 Lernzentrum von Ahouandédji

Originalgröße
 

09-4 Lernzentrum von Ahouandédji

Originalgröße
 

10. Project:Primary School of Zèbè, community of Tori-Bossito

Construction of 2 school buildings with 3 classrooms each as well as
office, storage room/library, toilets

Opened January 25, 2011
 

10 Grundschule von Zèbè

Originalgröße
 

11. Project: Public Primary School of Houngbagba, Community of Tori-Bossito, Republic of Benin

Construction of two buildings holding three classrooms each, toilets
renovation of old classrooms

Opened January 2012
 

11c Grundschule von Houngbagba

Originalgröße
 
 

11a Grundschule von Houngbagba

Originalgröße
 

11b Grundschule von Houngbagba

Originalgröße
 

12th project: Public Primary School of Kpanroon-Center, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened February 22nd, 2013
 

12 Grundschule Kpanroun-Zentrum

Originalgröße
 

13th project: Public Primary School of Ahowegodo, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened February 22nd, 2013
 

13 Grundschule-Ahowegodo

Originalgröße
 

13 Grundschule von Ahowegodo

Originalgröße
 

14th project: Public Primary School of Kpe group B, community of Abomey-Calavi

Construction of two solid school buildings holding three classrooms each,
one office, one storage room, and toilets

Opened January 24th, 2014
 

93 beide Gebäude

Originalgröße
 

15th project: Public Primary School of Avagbe, community of Abomey-Calavi

Construction of one school building holding three classrooms,
one office, and one storage room

Completed May 18th, 2014
 

avagbe

 

16th project: Public Primary School of Kpaviédja, community of Abomey-Calavi

Construction of two school buildings holding two classrooms each

Completed May 30th, 2014
 

kpaviedja

 

17th project: Public Primary School of Dodji-Aliho group B, community of Allada

Sponsored by Sternstunden e.V.

Construction of two solid school buildings holding three classrooms each,
one office, one storage room, and toilets
repair of the roof of one old building

Opened January 22nd, 2015
 

85-Beide-Gebaude-im-uberblick

 

18th project: Public Primary School of Wawata group B, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened April 3rd, 2015
 

last picture

 

19th project: Public Secondary School of Sahoro, community of Sakete

Construction of two buildings holding three classrooms and office each
Construction of toilets with 8 cabins

Completed October 23rd, 2015
 

77 Auch die Gebaude sind fertig angemalt. Hier ist das  vordere gebaude von vorne

 
 

78 von der Seite

 

20th project: Public Secondary School of Kansounkpa, community of Abomey-Calavi

Construction of two buildings holding 4 classrooms each
Construction of two toilets with 6 cabins each

Completed January 22nd, 2016
 

79 das hintere Gebäude fertig. Rechts hinten kann man das  vordere Gebäude erkennen

 

21st project: Public Primary School of Avagbe-Fandji, community of Abomey-Calavi

Construction of one building holding 2 classrooms
Construction of one toilet with 6 cabins

Opened March 4th, 2016
 

21 Fandji

 

22nd project: Public Primary School Zoundja 1 (Zopah), community of Abomey-Calavi

Construction of one building holding 3 classrooms
Construction of one toilet with 8 cabins

Opened March 11th, 2016
 

DSC_0635

 

23rd project: Public Primary School of Tchoukou-Kpevi Group B, community of Akpro-Misérété

Construction of two buildings holding three classrooms, one office, and one storage room each
Construction of toilets with 8 cabins

Opened October 21th, 2016
 

23 Tchoukou-Kpevi

 

24th project: Public Primary School of Awake, community of Abomey-Calavi

Construction of two buildings holding three classrooms, one office, and one storage room each
Construction of toilets with 8 cabins

Completed November 7th, 2016
 

24 Awake

 

25th project: Public Primary School of Zoundja-Kpevi, community of Abomey-Calavi

Construction of one building holding 3 classrooms
Construction of toilets with 8 cabins

Completed December 8th, 2016
 

31 Das Gebäude ist wunderschoen

 

26th project: Public Primary School of Golo-Alladacomey, community of Abomey-Calavi

Construction of one building holding 4 classrooms
Construction of toilets with 8 cabins

Completed January 9th, 2017
 

44 Das Gebaeude sieht wunderschoen  aus

 

27th project: Public Primary School of Yekon-Do Group B, community of Abomey-Calavi

Construction of one building holding 4 classrooms
Construction of toilets with 8 cabins

Completed January 16th, 2017
 

63 Alle Kinder in die Schule!

 

28th project: Public Primary School of Dodji-Aliho Group A, community of Allada

Renovation of one building holding 3 classrooms, office, and storage room
Reconstruction of a shelter with 3 classrooms

Completed April 1st, 2017
 

46 Überblick über die Gebäude der Gruppe A

 

29th project: Primary School of Tchiweten Ciminti, Community of Tenhya, Republic of Niger

Construction of one building holding 3 classrooms, office, and storage
Construction of one building holding 2 homes for teachers
Construction of 2 toilets with 4 cabins each

Completed April 24th, 2017
 

74 Die Bevölkerung von Tchiweten ergreift Besitz von ihrem neuen Schulgebäude

 

30th project: Public Primary School of Couffonou group B, community of Kpomasse

Sponsored by Sternstunden e.V. and Bild hilft e.V.

Construction of two solid school buildings holding three classrooms each,
one office, one storage room, and toilets
Renovation of old school buildings

Completed December 24th, 2017
 

41 Die Schule im Überblick

 

31st project: Public Primary School of Aissessa, municipality of Ze

Construction of a building holding three classrooms
Construction of toilets with 8 cabins

Opened on June 7th, 2018
 

14 Auch die logo sind angebracht

 

32nd project: Public Secondary School Ahossougbeta, community of Abomey-Calavi

Construction of four buildings holding two classrooms each
Construction of 2 toilets with 8 cabins each

Opened on June 15th, 2018
 

DSC_1306

 

33rd project: Public Primary School of Dekanme Group A, community of Kpomasse

Construction of a building holding three classrooms
Construction of toilets with 8 cabins

Opened on June 22nd, 2018
 

21 fertig angemalt sieht die Schule wunderschön aus

 

34th project: Public Kindergarten and Preschool of Segbohoué II, community of Kpomasse

Construction of a building holding three classrooms, one office, and one storage room
Construction of toilets with 6 cabins

Opened on July 24th, 2018
 

25

 


35th project: Public Secondary School of Dedome, community of Kpomasse

Construction of two buildings holding four classrooms each
Construction of two toiletblocks with total of 16 cabins
And a borehole with water tower

Opened on Januray 24th, 2019
 

Dedome-finished

 


36th project: Public Primary School of Govié Group B, community of Allada

Construction of a building holding three classrooms

Opened on February 26th, 2019
 

Govie-finished

 


37th project: Public Secondary School of Gbetagbo, community of Abomey-Calavi

Construction of two buildings holding four classrooms each
Construction of two toilet annex with 8 cabins each
And a borehole with water tower

Opened on March 1st, 2019
 

Gbetagbo-finished

 


38th project: Public Elementary School of Asroli, community of Allada

Construction of a building holding three classrooms, one office, and one storage room
Construction of toilets with 8 cabins

Opened on March 21st, 2019
 

Asroli-finished

 


39th project: Public Primary School Adevi Group B, Community of Toffo

Construction of a building holding three classrooms, one office, and one storage room
Construction of toilets with 8 cabins

Finished on March 25th, 2019


40th project: Public Nursery of Agbanto, community of Kpomasse

Construction of two buildings holding two classrooms each, one office,
and a third building holding a kitchen and storage space, and toilets

Opened on April 12th, 2019
 

Agbanto-finished1

 
 

Agbanto-finished2

 

~~~