print this page

Projects 1-20

Click on the link "Go to Google Earth" to see the school locations on Google Earth.

1. Project: Primary School Makoko Water Side, Yaba, Lagos, Nigeria

Two-storey lake dwelling built from ironwood, facing the laguna of Lagos. The school includes 8 classrooms;

completed and opened in 1994.
 

01 Grundschule Makoko Water Side

 

2. Project: Primary School Drabo, Republic of Benin

Restoration of a 3-classroom building with office that was already partially completed by the village community; construction of an additional building with 3 classrooms;

completed and opened in 1998.
 

02 Grundschule Drabo

 

3. Project: Primary School Ouega, Republic of Benin

Restoration and completion of a 3-classroom building with office that was already partially completed by the village community. The government constructed an additional building including 3 classrooms;

completed and opened in 1999.
 

03 Grundschule Ouega

 

4. Project: Primary School Idi-Ogou, Pira, Republic of Benin

Construction of 2 buildings with 3 classrooms each as well as office, library and toilets; completed and opened November 4th 2001.
 

04 Grundschule Idi-Ogou

 

5. Project: Primary School Gbedaconou, Republic of Benin

Construction of 2 school buildings with 3 classrooms each as well as office, storage room/library, toilets and a small sanitary ward.

Completed and opened December 13th 2002.
 

05-Gbedaconou

 

This school was regarded as especially eligible by the American Organisation IFESH (International Foundation for Education & Self- Help) in the school year of 2003/2004. The school received an ample donation of school materials from IFESH.

 

05a Krankenstation von Gbedaconou
sanitary ward

Originalgröße
 

05b Die Betreuerinnen der Station

Originalgröße
 
To evacuate difficult cases the Rotary Club of Rosenheim offered an ambulance to the health center.
 

Der Krankenwagen kommt an der Krankenstation von Gbedaconou an
the new ambulance arrives at Gbedaconou

Originalgröße
 

Der Krankenwagen bezieht seine neue Gerage
ambulance and its garage

Originalgröße
 
 

Schlüsselübergabe
hand-over of keys

Originalgröße
 

6. Project: Primary School Aidohoue Finagnon, Republic of Benin

Construction of a 3-classroom building with toilets.

Completion: March 2004
 

06-Aidohoue-fertig

 

7. Project: Public Primary School Kpoto-Agongo, Republic of Benin

Construction of 2 buildings with 3 classrooms each, office- and library building and toilets.

Completion: October 2005
Opening ceremony: October 22nd 2005
 

07 Grundschule Kpoto-Agongo

Originalgröße
 
Both buildings

8. Project: Union Secondary School of Asohouè Cada, community of Tori-Bossito

Construction of
2 buildings holding 3 classrooms each, 1 building holding 4 classrooms, 1 toilet block with 10 cells for girls, 1 toilet block with 10 cells for boys, 2 open halls covered with roofs for breaks and recreation

works closed February 2010
 

08-1 Gymnasium Union Asohouè Cada

Originalgröße
 

08-2 Gymnasium Union Asohouè Cada

Originalgröße
 
 

08-3 Gymnasium Union Asohouè Cada

Originalgröße
 

9. Project: study hall of Ahouandédji, community of tori-Bossito

Construction of
1 hall equipped with furniture and books
1 guest house with toilets
1 public toilet block with 8 cells
1 small elderly people's home
1 pavilion

opened : April 30, 2010
 

09-1 Lernzentrum von Ahouandédji

Originalgröße
 

09-2 Lernzentrum von Ahouandédji

Originalgröße
 
 

09-3 Lernzentrum von Ahouandédji

Originalgröße
 

09-4 Lernzentrum von Ahouandédji

Originalgröße
 

10. Project:Primary School of Zèbè, community of Tori-Bossito

Construction of 2 school buildings with 3 classrooms each as well as
office, storage room/library, toilets

Opened January 25, 2011
 

10 Grundschule von Zèbè

Originalgröße
 

11. Project: Public Primary School of Houngbagba, Community of Tori-Bossito, Republic of Benin

Construction of two buildings holding three classrooms each, toilets
renovation of old classrooms

Opened January 2012
 

11c Grundschule von Houngbagba

Originalgröße
 
 

11a Grundschule von Houngbagba

Originalgröße
 

11b Grundschule von Houngbagba

Originalgröße
 

12th project: Public Primary School of Kpanroon-Center, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened February 22nd, 2013
 

12 Grundschule Kpanroun-Zentrum

Originalgröße
 

13th project: Public Primary School of Ahowegodo, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened February 22nd, 2013
 

13 Grundschule-Ahowegodo

Originalgröße
 

13 Grundschule von Ahowegodo

Originalgröße
 

14th project: Public Primary School of Kpe group B, community of Abomey-Calavi

Construction of two solid school buildings holding three classrooms each,
one office, one storage room, and toilets

Opened January 24th, 2014
 

93 beide Gebäude

Originalgröße
 

15th project: Public Primary School of Avagbe, community of Abomey-Calavi

Construction of one school building holding three classrooms,
one office, and one storage room

Completed May 18th, 2014
 

avagbe

 

16th project: Public Primary School of Kpaviédja, community of Abomey-Calavi

Construction of two school buildings holding two classrooms each

Completed May 30th, 2014
 

kpaviedja

 

17th project: Public Primary School of Dodji-Aliho group B, community of Allada

Sponsored by Sternstunden e.V.

Construction of two solid school buildings holding three classrooms each,
one office, one storage room, and toilets
repair of the roof of one old building

Opened January 22nd, 2015
 

85-Beide-Gebaude-im-uberblick

 

18th project: Public Primary School of Wawata group B, community of Abomey-Calavi

Construction of one building holding three classrooms, office, storage room / library, toilets

Opened April 3rd, 2015
 

last picture

 

19th project: Public Secondary School of Sahoro, community of Sakete

Construction of two buildings holding three classrooms and office each
Construction of toilets with 8 cabins

Completed October 23rd, 2015
 

77 Auch die Gebaude sind fertig angemalt. Hier ist das  vordere gebaude von vorne

 
 

78 von der Seite

 

20th project: Public Secondary School of Kansounkpa, community of Abomey-Calavi

Construction of two buildings holding 4 classrooms each
Construction of two toilets with 6 cabins each

Completed January 22nd, 2016
 

79 das hintere Gebäude fertig. Rechts hinten kann man das  vordere Gebäude erkennen

 

~~~